Violation Detail
Standard Cited: 19100107 L04 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1262357.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,315.00
Current Penalty: $4,157.00
Issuance Date: 02/06/2018
Nr Instances: 3
Nr Exposed: 6
Abatement Date: 02/15/2018
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 03/06/2018
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/06/2018 | $4,157.00 | 02/15/2018 | Serious | |
| Penalty | Z: Issued | 02/06/2018 | $8,315.00 | 02/15/2018 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.107(l)(4)(i): All areas were not kept free of the accumulation of powder coating dusts, particularly such horizontal surfaces as ledges, beams, pipes, hoods, booths, and floors. a. Lewco, Inc. located in Sandusky, Ohio: On or about September 8, 2017, the employer did not ensure surfaces inside of powder coating booth #1, located in the powder coating department, were kept free of accumulations of combustible powder coating dust. b. Lewco, Inc. located in Sandusky, Ohio: On or about September 8, 2017, the employer did not ensure surfaces inside of powder coating booth #2, located in the powder coating department, were kept free of accumulations of combustible powder coating dust. c. Lewco, Inc. located in Sandusky, Ohio: On or about September 8, 2017, the employer did not ensure the floor around the spray to waste booth, located in the powder coating department, was kept free of accumulations of combustible powder coating dust.