Violation Detail
Standard Cited: 19260451 G01 VII General requirements.
Inspection Nr: 1258842.015
Citation: 01003
Citation Type: Serious
Abatement Date: 03/01/2018 2
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 02/21/2018
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0316100
Contest Date:
Final Order: 03/19/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/19/2018 | $12,934.00 | 03/01/2018 | Serious | |
Penalty | Z: Issued | 02/21/2018 | $12,934.00 | 03/01/2018 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(g)(1)(vii): Each employee on a scaffold, not otherwise specified in paragraphs (g)(1)(i) through (g)(1)(vi) of this section, more than 10 feet (3.1 m) above lower level was not protected from falls by the use of personal fall arrest systems or guardrail systems meeting the requirements of paragraph (g)(4) of this section. a) Tenth Floor, Column 61 - On or about August 24, 2017, construction workers applying waterproofing to the edge of a concrete floor slab were not provided with an independent lifeline with which to attach their personal fall arrest equipment or a guardrail system meeting the requirements of 1926.451(g)(4) and were exposed to an 80 foot fall from the outside perimeter edges of a mason's multi-point scaffold platform . In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.