Violation Detail
Standard Cited: 19260251 A01 Rigging equipment for material handling.
Inspection Nr: 1249118.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,802.00
Current Penalty: $2,500.00
Issuance Date: 09/22/2017
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/19/2017
Gravity: 1
Report ID: 0830400
Contest Date:
Final Order: 10/18/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/18/2017 | $2,500.00 | 10/19/2017 | Serious | |
Penalty | Z: Issued | 09/22/2017 | $3,802.00 | 10/19/2017 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.251(a)(1): Rigging equipment for material handling shall be inspected prior to use on each shift and as necessary during its use to ensure that it is safe. Defective rigging equipment shall be removed from service. (a)First Dakota Enterprises, Inc. at Hilgers Gulch Sanitary Sewer Line Project, Pierre, SD 57501: On or about and at times prior to July 14, 2017, the employer did not ensure that a 5/8-inch four leg wire rope bridle sling was inspected prior to use. The four-legged sling had numerous wires within an independent wire rope that were broken around a damaged thimble on one of the legs used to raise and lower the trench box from the excavation. This condition exposed employees to struck by hazards associated with rigging failure.