Violation Detail
Standard Cited: 19260451 F01 General requirements.
Inspection Nr: 1245350.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,803.00
Current Penalty: $2,500.00
Issuance Date: 12/18/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 01/16/2018
Gravity: 10
Report ID: 0418200
Contest Date:
Final Order: 01/30/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/30/2018 | $2,500.00 | 01/16/2018 | Serious | |
| Penalty | Z: Issued | 12/18/2017 | $3,803.00 | 01/16/2018 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(f)(1): Scaffold and/or scaffold components were loaded in excess of their maximum intended loads or rated capacities, whichever was less: 1) Third Floor, West side of the building: On or about July 5, 2017, and at times prior, the employer exposed employees to struck-by hazards while lowering a 1,100 pound metal panel sign from the 3rd floor to the parking deck, in that the rated capacity of the Bisomac (model # BISOMAC210-1000) hoist was exceeded.