Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1239399.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,408.00
Current Penalty: $6,000.00
Issuance Date: 09/28/2017
Nr Instances: 3
Nr Exposed: 15
Abatement Date: 10/23/2017
Gravity: 10
Report ID: 0213600
Contest Date: 10/25/2017
Final Order: 01/08/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 01/08/2018 | $6,000.00 | 10/23/2017 | Serious | |
| Penalty | C: Contested | 10/27/2017 | $11,408.00 | 10/23/2017 | Serious | |
| Penalty | Z: Issued | 09/28/2017 | $11,408.00 | 10/23/2017 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle: a) On or about 06/14/2017 in the weaving department; where the point of operation on the crimper/cutters was accessible through the point of operation guards. The openings in the guards were too big, too close to the point of operation. b) On or about 06/14/2017 in the shear areas; where the point of operation guards on the Aidra shear (3 1/2 inch opening - 6 1/2 inches from the point of operation) and the Peck, Stow shear (3 inch opening - 6 inches from the point of operation) did not protect the shear operators from the point of operation. c) On or about 06/14/2017 in the shear area; where the Stamco shear was operated with two operators, each having their own foot pedal. The foot pedals did not require concurrent operation of both foot pedals by first releasing both pedals before initiating the next stroke of the press. ABATEMENT DOCUMENTATION REQUIRED
Translate