Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1226822.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,432.00
Current Penalty: $3,500.00
Issuance Date: 10/17/2017
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 12/07/2017
Gravity: 1
Report ID: 0627100
Contest Date:
Final Order: 11/15/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/15/2017 | $3,500.00 | 12/07/2017 | Serious | |
Penalty | Z: Issued | 10/17/2017 | $5,432.00 | 12/07/2017 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.119(d)(3)(i)(B): Piping and instrument diagrams (P&ID's); This violation was most recently observed on or about April 17, 2017 and times prior thereto and times thereafter, in the Reed Lane engine room when the employer failed to ensure the Process Safety Information (PSI) such as Piping & Instruments Diagrams (P&ID) were updated and accurate. Discrepancies include but are not limited to the HPL piping from the Recirculator to the Hansen Auto-Purger and the discharge lines from PSV's 123 and 107 on the High Pressure Receiver were missing on the P&ID drawings.