Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1217094.015
Citation: 01003
Citation Type: Serious
Abatement Date: 04/03/2017 7
Initial Penalty: $4,183.00
Current Penalty: $4,183.00
Issuance Date: 03/28/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 05/08/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/28/2017 | $4,183.00 | 04/03/2017 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6). a) On or about March 10, 2017, employer permitted employees to erect and use a ladder jack scaffold platform in close proximity to energized power lines having a voltage of 120/240 volts. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.