Violation Detail
Standard Cited: 19100253 B04 III Oxygen-fuel gas welding and cutting.
Inspection Nr: 1212070.015
Citation: 01003
Citation Type: Serious
Abatement Date: 06/02/2017 2
Initial Penalty: $9,959.00
Current Penalty: $9,959.00
Issuance Date: 05/08/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0216000
Contest Date: 05/25/2017
Final Order: 01/14/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/14/2019 | $9,959.00 | 06/02/2017 | Serious | |
Penalty | C: Contested | 05/31/2017 | $9,959.00 | 06/02/2017 | Serious | |
Penalty | Z: Issued | 05/08/2017 | $9,959.00 | 06/02/2017 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.253(b)(4)(iii): Oxygen cylinders in storage were not separated from fuel-gas cylinders or combustible materials a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least one-half hour: Location: Maintenance shop, 500 Fenimore Road, Mamaroneck, NY 10543 On or about 11/14/16 a) Oxygen, Acetylene and Propane cylinders were stored immediately next to each other.