Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1210520.015
Citation: 01003
Citation Type: Serious
Abatement Date: 05/11/2017 7
Initial Penalty: $12,675.00
Current Penalty: $12,675.00
Issuance Date: 05/05/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 06/09/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 05/05/2017 | $12,675.00 | 05/11/2017 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels was not fully planked or decked between front uprights and the guardrail supports: a) On or about February 12, 2017, employees working from frame scaffolding were exposed to fall hazards of up to approximately 11.5 feet where the scaffold platform was not fully decked. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.