Standard Cited: 19100269 M03 II Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1201821.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $12,675.00
Current Penalty: $0.00
Issuance Date: 06/01/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0134000
Contest Date: 06/20/2017
Final Order: 05/14/2018
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/14/2018 | $0.00 | Serious | ||
Penalty | C: Contested | 06/21/2017 | $12,675.00 | Serious | ||
Penalty | Z: Issued | 06/01/2017 | $12,675.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.269(m)(3)(ii): The employer did not ensure that all switches, disconnectors, jumpers, taps, and other means through which known sources of electric energy may be supplied to the particular lines and equipment to be denenergized were open. The employer did not render such means inoperable, unless its design does not so permit, and then sure that such means are tagged to indicate that employees are at work: (a) Location - Main Street, Malden, MA: On or about 12/20/16, the employer failed to ensure that a switch employees were opening was de-energized and exposed employees to electrical burns.