Violation Detail
Standard Cited: 19100110 E04 III Storage and handling of liquefied petroleum gases.
Inspection Nr: 1195529.015
Citation: 01003
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $5,070.00
Current Penalty: $3,549.00
Issuance Date: 04/28/2017
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC): C
Gravity: 5
Report ID: 0214500
Contest Date:
Final Order: 05/23/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/23/2017 | $3,549.00 | Serious | ||
Penalty | Z: Issued | 04/28/2017 | $5,070.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.110(e)(4)(iii): Permanent and removable fuel containers shall be securely mounted to prevent jarring loose, slipping, or rotating, and the fastenings shall be designed and constructed to withstand static loading in any direction equal to twice the weight of the tank and attachments when filled with fuel using a safety factor of not less than four based on the ultimate strength of the material to be used. Field welding, when necessary, shall be made only on saddle plates, lugs or brackets, originally attached to the container by the tank manufacturer. a) Production Area: The index pin on the Kalmar AC powered industrial truck was not installed correctly; thus allowing the propane cylinder to rotate during operation, on or about December 21, 2016. b)Production Area: The index pin on the TCI powered industrial truck was missing; thus allowing the propane cylinder to rotate during operation, on or about December 21, 2016.