Violation Detail
Standard Cited: 19260453 B02 VI Aerial lifts.
Inspection Nr: 1193936.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,346.00
Current Penalty: $4,346.00
Issuance Date: 01/20/2017
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0625500
Contest Date:
Final Order: 03/07/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 01/20/2017 | $4,346.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.453(b)(2)(vi): Boom and basket load limits specified by the manufacturer were exceeded: Construction site, back of building: On or about November 29, 2016, employees were exposed to falls, when the Genie S-45 aerial lift was occupied by three employees, while installing insulation board and sheet metal siding.