Violation Detail
Standard Cited: 19100303 B01 VIII General.
Inspection Nr: 1188375.015
Citation: 01003
Citation Type: Serious
Abatement Date: 05/24/2018 2
Initial Penalty: $8,963.00
Current Penalty: $4,000.00
Issuance Date: 04/24/2017
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 5
Report ID: 0524700
Contest Date: 05/12/2017
Final Order: 04/09/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/09/2018 | $4,000.00 | 05/24/2018 | Serious | |
Penalty | C: Contested | 05/16/2017 | $8,963.00 | 05/17/2017 | Serious | |
Penalty | Z: Issued | 04/24/2017 | $8,963.00 | 05/17/2017 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.303(b)(1)(viii): Electrical equipment was not free from recognized hazards based on other factors that contribute to the practical safeguarding of persons using or likely to come in contact with the equipment: a. Napoleon Spring Works, Inc. - Archbold, Ohio: On or about November 1, 2016, employees using the 480 volt main electrical panel to turn power off/on to the punch table each day were exposed to electrical hazards in that the external disconnect was damaged.