Standard Cited: 19100333 B02 IV B Selection and use of work practices
This violation item has been deleted.
Inspection Nr: 1186426.015
Citation: 01003
Citation Type: Serious
Abatement Status:
Initial Penalty: $12,471.00
Current Penalty: $0.00
Issuance Date: 12/06/2016
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 01/03/2017
Gravity: 10
Report ID: 0418200
Contest Date:
Final Order: 01/20/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/20/2017 | $0.00 | 01/03/2017 | Serious | |
Penalty | Z: Issued | 12/06/2016 | $12,471.00 | 01/03/2017 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.333(b)(2)(iv)(B): Before circuits or equipment was worked as deenergized, a qualified person did not use test equipment to test the circuit elements and electrical parts of equipment to which employees would be exposed and did not verify that electrical energy had been disconnected: a. Electrical Room - On or about October 19, 2016, employees were exposed to arc flash/blast hazards, in that verification that electrical current was not present and deenergization of circuits was not provided to employees doing voltage testing and replacement of electrical components.