Violation Detail
Standard Cited: 19261404 D01 III
Inspection Nr: 1175637.015
Citation: 01003
Citation Type: Serious
Abatement Date: 01/02/2018 2
Initial Penalty: $12,548.00
Current Penalty: $10,000.00
Issuance Date: 02/21/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0111400
Contest Date: 03/15/2017
Final Order: 02/09/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/09/2018 | $10,000.00 | 01/02/2018 | Serious | |
Penalty | C: Contested | 03/22/2017 | $12,548.00 | 04/11/2017 | Serious | |
Penalty | Z: Issued | 02/21/2017 | $12,548.00 | 04/11/2017 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.1404(d)(1)(iii): Before commencing assembly/disassembly operations, the A/D director did not ensure that the crew members understood all of the hazardous positions/locations to be avoided: During the assembly and disassembly of a DEMAG AC 500-1 Telescoping Boom Crane (serial number 84090), the A/D Director did not effectively communicate to all crew members hazards to avoid.