Violation Detail
Standard Cited: 19260350 A09 Gas welding and cutting.
Inspection Nr: 1167526.015
Citation: 01003
Citation Type: Other
Abatement Date: 06/16/2018 2
Initial Penalty: $6,338.00
Current Penalty: $1,000.00
Issuance Date: 02/02/2017
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity:
Report ID: 0522500
Contest Date: 03/03/2017
Final Order: 05/16/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/16/2018 | $1,000.00 | 06/16/2018 | Other | |
Penalty | C: Contested | 03/09/2017 | $6,338.00 | 02/22/2017 | Serious | |
Penalty | Z: Issued | 02/02/2017 | $6,338.00 | 02/22/2017 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.350(a)(9): Compressed gas cylinders shall be secured in an upright position at all times except, if necessary, for short periods of time while cylinders are actually being hoisted or carried. a. On or about August 4, 2016, located on the 1st floor of the former Columbus Municipal Light Plant, there was an unsecured propane cylinder that had a regulator attached, thereby exposing the employees to a fire/explosion hazard.