Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1157436.015
Citation: 01003
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $8,908.00
Current Penalty: $7,747.00
Issuance Date: 12/07/2016
Nr Instances: 22
Nr Exposed: 95
Abatement Date: 01/06/2017
Gravity:
Report ID: 0636900
Contest Date: 01/06/2017
Final Order: 04/26/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 04/26/2017 | $7,747.00 | 01/06/2017 | Other | |
Penalty | C: Contested | 01/09/2017 | $8,908.00 | 01/06/2017 | Serious | |
Penalty | Z: Issued | 12/07/2016 | $8,908.00 | 01/06/2017 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed. In the plant extrusion building, the employer did not ensure energy control procedures were reviewed annually exposing employees to electrical, amputation, struck-by and crush-by hazards. 1. LO# 2750-001 2. LO# 2750-004 3. LO# 2750-005 4. LO# 2750-006 5. LO# 2750-007 6. LO#2750-008 7. LO#2750-010 8. LO# 2750-011 9. LO# 2750-012 10. LO#2750-013 11. LO# 2750-014 12. LO# 2750-015 13. LO# 2750-016 14. LO# 2750-017 15. LO# 2750-018 16. LO#2750-019 17. LO# 2750-020 18. LO# 2750-021 19. LO# 2750-022 20. LO# 2750-023 21. LO# 2750-024 22. LO# 2750-025