Violation Detail
Standard Cited: 19100219 C02 I Mechanical power-transmission apparatus.
Inspection Nr: 1154776.015
Citation: 01003
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $7,839.00
Current Penalty: $3,500.00
Issuance Date: 12/06/2016
Nr Instances: 1
Nr Exposed: 12
Abatement Date:
Gravity:
Report ID: 0521100
Contest Date:
Final Order: 12/27/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/27/2016 | $3,500.00 | Other | ||
| Penalty | Z: Issued | 12/06/2016 | $7,839.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.219(c)(2)(i): All exposed part(s) of horizontal shafting seven (7) feet or less from floor or working platform were not protected by stationary casing(s) enclosing shafting completely or by trough(s) enclosing sides and top or sides and bottom of shafting: a) On or about 7/6/2016, The horizontal drive shafts for the paint line take off conveyors were not guarded at the time the inspection started. Employees removing parts from the conveyor were standing with 8" of the turning shafts as they removed parts to be stacked on carts.
Translate