Violation Detail
Standard Cited: 19260452 C03 Additional requirements applicable to specific types of scaffolds.
This violation item has been deleted.
Inspection Nr: 1151724.015
Citation: 01003
Citation Type: Serious
Abatement Status: Not Completed - Solicitor Advised
Initial Penalty: $9,603.00
Current Penalty: $0.00
Issuance Date: 08/17/2016
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 09/06/2016
Gravity: 10
Report ID: 0317300
Contest Date: 09/12/2016
Final Order: 05/23/2017
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/23/2017 | $0.00 | 09/06/2016 | Serious | |
Penalty | C: Contested | 09/14/2016 | $9,603.00 | 09/06/2016 | Serious | |
Penalty | Z: Issued | 08/17/2016 | $9,603.00 | 09/06/2016 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.452(c)(3): Frames and panels were not joined together vertically by coupling or stacking pins or equivalent means: a) 515 Briddle Drive, Wilmington, DE-On or about June 2, 2016, the employer failed to join the scaffold's frames and panels vertically by coupling or stacking pins. Note: Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written documentation.