Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1146497.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,017.00
Current Penalty: $8,017.00
Issuance Date: 09/27/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/26/2016
Gravity: 5
Report ID: 0636900
Contest Date: 10/21/2016
Final Order: 12/14/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 12/14/2016 | $8,017.00 | 10/26/2016 | Serious | |
Penalty | C: Contested | 10/28/2016 | $8,017.00 | 10/26/2016 | Serious | |
Penalty | Z: Issued | 09/27/2016 | $8,017.00 | 10/26/2016 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: In the production area, the employer did not perform a periodic annually inspection to ensure the Lockout/Tagout Program is working effectively, such as but not limited to #19 Flat Panel Lathe Machine.