Violation Detail
Standard Cited: 19100333 C03 Selection and use of work practices
Inspection Nr: 1145745.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,800.00
Current Penalty: $2,800.00
Issuance Date: 07/27/2016
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0112000
Contest Date:
Final Order: 10/06/2016
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 07/27/2016 | $2,800.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.333(c)(3): When work was to be performed near overhead lines, the lines were not deenergized and grounded, nor were other protective measures provided before work was started: a) 43 Park Place Job Site - On or about 5-6-16 - An employee was electrocuted while working from an aerial boom truck that was in close proximity to high voltage power lines that were not de-energized nor protected from contact. In addition the boom truck arm and bucket were not insulated.