Violation Detail
Standard Cited: 19100269 C03 II Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1134891.015
Citation: 01003
Citation Type: Serious
Abatement Status:
Initial Penalty: $12,471.00
Current Penalty: $0.00
Issuance Date: 09/01/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/28/2016
Gravity: 10
Report ID: 0418200
Contest Date:
Final Order: 09/27/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/27/2016 | $0.00 | 09/28/2016 | Serious | |
Penalty | Z: Issued | 09/01/2016 | $12,471.00 | 09/28/2016 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.269(c)(3)(ii): Additional job briefings shall be held if significant changes, which might affect the safety of the employees, occur during the course of the work. a. Plant Bowen, Cooling Tower 3 circuits and equipment - An additional job briefing was not held when significant changes, such as the discovery of energized conductors were found during the demolition of old circuit conductors at the Unit 3 Cooling Tower.