Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1113374.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,500.00
Current Penalty: $2,700.00
Issuance Date: 04/25/2016
Nr Instances: 2
Nr Exposed: 25
Abatement Date: 05/18/2016
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 05/10/2016
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/10/2016 | $2,700.00 | 05/18/2016 | Serious | |
Penalty | Z: Issued | 04/25/2016 | $4,500.00 | 05/18/2016 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a.) Edge Plastics, Inc. located at 449 Newman St. Mansfield, OH 44902; On or about December 18, 2015, the employer did not assure machine specific energy control procedures were developed before performing maintenance activities on injection molding press #15. Employees were required to work on a hydraulic cylinder inside the doors of the injection molding machine and did not deenergize the press, exposing employees to crush hazards in the event of unexpected start up of the press. b.) Edge Plastics, Inc. located at 449 Newman St. Mansfield, OH 44902; On or about December 18, 2015, the employer did not assure machine specific energy control procedures were developed before performing mold setting activities, on injection molding presses including, but not limited to the 64 Leader Lid Injection Molding machine.