Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 110519790
Citation: 01003
Citation Type: Serious
Abatement Status: X
Initial Penalty: $875.00
Current Penalty: $875.00
Issuance Date: 06/02/1998
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 06/14/1998
Gravity: 03
Report ID: 0935000
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate