Violation Detail
Standard Cited: 19260600 A06 I Equipment.
Inspection Nr: 1103493.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,200.00
Issuance Date: 04/05/2016
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 05/04/2016
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 04/21/2016
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/21/2016 | $4,200.00 | 05/04/2016 | Serious | |
| Penalty | Z: Issued | 04/05/2016 | $7,000.00 | 05/04/2016 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.600(a)(6)(i): For lines rated 50kV or below, a minimum of 10 feet was not maintained between the energized line and the equipment: On October 29, 2015 and at times prior thereto, the employer did not ensure his employees maintained a clearance distance of at least 10 feet between the overhead power lines and the heavy machinery they were operating, exposing the employees to electrical shock and electrocution hazards.
Translate