Violation Detail
Standard Cited: 19100068 B11 II A Manlifts.
Inspection Nr: 1088423.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,200.00
Issuance Date: 02/16/2016
Nr Instances: 1
Nr Exposed: 9
Abatement Date: 03/30/2016
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 03/11/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/11/2016 | $4,200.00 | 03/30/2016 | Serious | |
| Penalty | Z: Issued | 02/16/2016 | $7,000.00 | 03/30/2016 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.68(b)(11)(ii)(a): There was not a clearance of at least 5 feet between the center of the head pulley shaft and any ceiling obstruction. This violation occurred on or about August 22, 2015, the clearance between the center of the head pulley shaft and the ceiling was less than 5 feet, exposing employees to caught-in hazards.