Violation Detail
Standard Cited: 19100094 C03 I Ventilation.
Inspection Nr: 1076208.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $1,200.00
Current Penalty: $600.00
Issuance Date: 09/16/2015
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/13/2015
Gravity: 1
Report ID: 0419700
Contest Date:
Final Order: 10/08/2015
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/08/2015 | $600.00 | 10/13/2015 | Serious | |
Penalty | Z: Issued | 09/16/2015 | $1,200.00 | 10/13/2015 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.94(c)(3)(i): Spray booths shall be designed and constructed in accordance with CFR 29, 1910.107(b)(1) through (b)(4) and (b)(6) through (b)(10). for a more detailed discussion of fundamentals relating to this subject, see ANSI Z9.2-1960, which is incorporated by reference as specified in 1910.6. a). On or about July 8, 2015 employees were exposed to various hazards associated with spray booth operations because the spray booth/shed was not constructed in accordance with OSHA standards outline in 1910.107