Violation Detail
Standard Cited: 19100303 G01 General.
Inspection Nr: 1070467.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,000.00
Current Penalty: $3,000.00
Issuance Date: 09/09/2015
Nr Instances: 10
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 09/21/2015
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/21/2015 | $3,000.00 | Serious | ||
Penalty | Z: Issued | 09/09/2015 | $5,000.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.303(g)(1): Sufficient access and working space was not provided and maintained about all electric equipment (operating at 600 volts, nominal, or less to ground) to permit ready and safe operation and maintenance of such equipment: (a) On or about June 15, 2015, in the Scale Loading Area, electrical panels used to power equipment such as #21 west wet bin fan, #22 west wet bin fan, #23 east wet bin fan, LP truck dump, #26 bin sweep, #41 aeration fan east tank NE corner, #13 pit conveyor, and #43 aeration fan west tank NW corner were blocked with a wheat sample machine exposing employees to electrical shock hazards.