Violation Detail
Standard Cited: 19260416 E01 General requirements.
Inspection Nr: 1064184.015
Citation: 01003
Citation Type: Serious
Abatement Status: Not Completed - Solicitor Advised
Initial Penalty: $3,960.00
Current Penalty: $2,960.00
Issuance Date: 11/09/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/18/2015
Gravity: 5
Report ID: 0521100
Contest Date: 12/17/2015
Final Order: 08/23/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/23/2016 | $2,960.00 | 11/18/2015 | Serious | |
Penalty | C: Contested | 01/22/2016 | $3,960.00 | 11/18/2015 | Serious | |
Penalty | Z: Issued | 11/09/2015 | $3,960.00 | 11/18/2015 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.416(e)(1): Worn or frayed electric cords or cables were used: Affordable Exteriors project site at 7503 Feith St. Weston, WI: On 5/19/15, two extension cords supplying 120v power to a circular saw on the roof were spliced together and the splice covered with duct tape, exposing workers to shock, burn, and potential fall hazards from the roof to ground in the event of a shock.