Violation Detail
Standard Cited: 19100147 D06 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1062971.015
Citation: 01003
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $5,000.00
Issuance Date: 08/14/2015
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 12/31/2015
Gravity: 10
Report ID: 0111400
Contest Date:
Final Order: 09/01/2015
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/01/2015 | $5,000.00 | 12/31/2015 | Serious | |
| Penalty | Z: Issued | 08/14/2015 | $7,000.00 | 10/05/2015 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(d)(6): Prior to starting work on machines or equipment that had been locked out or tagged out, the authorized employee did not verify that isolation and deenergization of the machine or equipment had been accomplished: Parking Lot: An employee did not verify that the kill switch of a Van Hool Bus was functioning prior to checking belts and fluids in the engine compartment. A worker was injured.