Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1021840.015
Citation: 01003
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,300.00
Current Penalty: $2,145.00
Issuance Date: 06/24/2015
Nr Instances: 3
Nr Exposed: 25
Abatement Date: 07/21/2015
Gravity: 1
Report ID: 0418100
Contest Date:
Final Order: 07/16/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/16/2015 | $2,145.00 | 07/21/2015 | Serious | |
Penalty | Z: Issued | 06/24/2015 | $3,300.00 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: On 1/28/15, in Plant 4, the employer did not ensure emergency exit doors were not equipped with dead bolt locks. Three doors were equipped with dead bolt locks in the facility in the following locations: 1 - Paint Prep Area - spray painting operations 2 - Press Area - various press operations 3 - Maintenance Shop - various operations including welding/cutting operations No abatement certification or documentation is required for this item.