Violation Detail
Standard Cited: 19100107 B09 Spray finishing using flammable and combustible materials.
Inspection Nr: 1860460.015
Citation: 01002F
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,621.00
Current Penalty: $0.00
Issuance Date: 04/24/2026
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 05/13/2026
Gravity: 5
Report ID: 0728500
Contest Date:
Final Order: 05/26/2026
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/26/2026 | $0.00 | 05/13/2026 | Serious | |
| Penalty | Z: Issued | 04/24/2026 | $6,621.00 | 05/13/2026 | Serious |
Text For Citation: 01 Item/Group: 002F Hazard:
29 CFR 1910.107(b)(9): A clear space of not less than 3 feet on all sides was not kept free from storage or combustible construction: At the work site located at 2401 Southwest Parkway St. Joseph Missouri: Employees were exposed to fire and explosion hazards. Flammable and explosive materials such as plastic ducting and powder coat were stored against the back wall of the powder spray booth.