Violation Detail
Standard Cited: 19100107 D07 Spray finishing using flammable and combustible materials.
Inspection Nr: 1860460.015
Citation: 01002E
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/24/2026
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0728500
Contest Date:
Final Order: 05/26/2026
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/26/2026 | $0.00 | Serious | ||
| Penalty | Z: Issued | 04/24/2026 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 002E Hazard:
29 CFR 1910.107(d)(7): Exhaust ducts were not constructed of steel: At the work site located at 2401 Southwest Parkway St. Joseph Missouri: Employees were exposed to fire and chemical hazards. The exhaust ducts of a spray tent were fashioned of flexible plastic instead of steel.
Translate