Violation Detail
Standard Cited: 19100134 F02 Respiratory Protection.
Inspection Nr: 1706159.015
Citation: 01002D
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/22/2024
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 09/06/2024
Gravity: 10
Report ID: 0317900
Contest Date:
Final Order: 05/16/2024
Related Event Code (REC): C
Emphasis:
Substance: 9000
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 07/30/2024 | $0.00 | 09/06/2024 | Serious | |
Penalty | I: Informal Settlement | 05/16/2024 | $0.00 | 07/31/2024 | Serious | |
Penalty | Z: Issued | 04/22/2024 | $0.00 | 05/16/2024 | Serious |
Text For Citation: 01 Item/Group: 002D Hazard:
29 CFR 1910.134(f)(2): Employee(s) required to wear tight-fitting facepiece respirators were not fit tested prior to initial use of the respirator: a) Prestige Marble & Granite - On or about October 26, 2023, employees were required to wear disposable, as well as elastomeric respirators, when dry cutting on marble and granite and the employer did not fit-test employees on respirators prior to initial use. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.