Violation Detail
Standard Cited: 19100037 B02 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1601440.015
Citation: 01002D
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/30/2022
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 01/02/2024
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 12/21/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 11/21/2023 | $0.00 | 01/02/2024 | Serious | |
Penalty | I: Informal Settlement | 12/21/2022 | $0.00 | 01/02/2024 | Serious | |
Penalty | Z: Issued | 11/30/2022 | $0.00 | 12/19/2022 | Serious |
Text For Citation: 01 Item/Group: 002D Hazard:
29 CFR 1910.37(b)(2): Each exit was not clearly visible and marked by a sign reading "Exit": (a) 158 West Jackson Street, New Holland PA, Lower Engine Room - On or about July 13, 2022, the doors to leading to the Savencia part of the building, identified as a means of egress, from the Lower Engine Room were not marked by a sign reading "Exit". b) 158 West Jackson Street, New Holland PA, Lower Engine Room - On or about July 13, 2022, the doors leading to the Mix room from the Lower Engine Room, identified as a means of egress, were not marked by a sign reading "Exit". Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.