Violation Detail
Standard Cited: 19260651 J02 Specific Excavation Requirements.
Inspection Nr: 1742887.015
Citation: 01002C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/24/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/25/2024
Gravity: 10
Report ID: 0830400
Contest Date:
Final Order: 10/22/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/24/2024 | $0.00 | 10/25/2024 | Serious |
Text For Citation: 01 Item/Group: 002C Hazard:
29 CFR 1926.651(j)(2): Protection was not provided by placing and keeping excavated or other materials or equipment at least 2 feet (.61m) from the edge of excavations, or by the use of retaining devices that were sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary. (a)Stone Hill Excavation, LLC at 351 South Douglas Street, Salem, SD 57058: On or about and at times prior to April 22, 2024, the employer did not ensure spoil piles were positioned two feet or greater from the edge of the trench excavation where employees were in the trench performing work. This condition exposed employees to struck-by and crushing hazards.