Violation Detail
Standard Cited: 19100269 M03 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1598201.015
Citation: 01002C
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $14,502.00
Current Penalty: $0.00
Issuance Date: 11/17/2022
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 12/16/2022
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/16/2022 | $0.00 | Serious | ||
Penalty | Z: Issued | 11/17/2022 | $14,502.00 | Serious |
Text For Citation: 01 Item/Group: 002C Hazard:
29 CFR 1910.269(m)(3)(ii): The employer did not ensure that all switches, disconnectors, jumpers, taps, and other means through which known sources of electric energy might be supplied to the particular lines and equipment were de-energized / inoperable (i.e. open) and then did not ensure that such means were tagged to indicate that employees were at work. (a) Location - 500 Salem Street, Medford, MA On or about 05/26/2022, an employee was not protected from a known energized electrical source.