Violation Detail
Standard Cited: 19100029 B02 III Fall protection systems and falling object protection-criteria and practices.
Inspection Nr: 1445615.015
Citation: 01002C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/23/2020
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 05/19/2020
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 05/26/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/26/2020 | $0.00 | 05/19/2020 | Serious | |
| Penalty | Z: Issued | 04/23/2020 | $0.00 | 05/19/2020 | Serious |
Text For Citation: 01 Item/Group: 002C Hazard:
29 CFR 1910.29(b)(2)(iii): (iii) Intermediate vertical members (such as balusters) are installed no more than 19 inches (48 cm) apart; (a) Packing Robot 10/11 - On December 3, 2019, the employer did not ensure that intermediate vertical members were installed no more than 19 inches apart. The distance between the vertical members throughout the guardrail system including the vertical members located at the end of the south platform guardrail system measured approximately 30 inches. In accordance with the requirements of 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete and must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase, or repair of the equipment, photographic or video evidence of abatement, or other written records.