Violation Detail
Standard Cited: 19100218 F01 I Forging machines.
Inspection Nr: 1348105.015
Citation: 01002C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,419.00
Current Penalty: $0.00
Issuance Date: 01/28/2019
Nr Instances: 2
Nr Exposed: 20
Abatement Date: 02/15/2019
Gravity: 5
Report ID: 0522500
Contest Date:
Final Order: 02/15/2019
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/15/2019 | $0.00 | 02/15/2019 | Serious | |
Penalty | Z: Issued | 01/28/2019 | $10,419.00 | 02/15/2019 | Serious |
Text For Citation: 01 Item/Group: 002C Hazard:
29 CFR 1910.218(f)(1): Mechanical forging presses. When dies are being changed or maintenance is being performed on the press, the following shall be accomplished: 29 CFR 1910.218(f)(1)(i): The power to the press shall be locked out. a. On or about October 1, 2018, the employer did not ensure that press AMP #11 had its power locked out when performing service and maintenance activities on the presses, i.e. tool changes/change over and other set-up activities, thereby exposing the employees to caught-in hazards from the unexpected start-up and/or release of stored energy. b. On or about October 1, 2018, the employer did not ensure that press Farina #17 had its power locked out when performing service and maintenance activities on the presses, i.e. tool changes/change over and other set-up activities, thereby exposing the employees to caught-in hazards from the unexpected start-up and/or release of stored energy.