Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1342097.015
Citation: 01002C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,934.00
Current Penalty: $0.00
Issuance Date: 10/30/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 01/21/2019
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 11/29/2018
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/29/2018 | $0.00 | 01/21/2019 | Serious | |
Penalty | Z: Issued | 10/30/2018 | $12,934.00 | 12/03/2018 | Serious |
Text For Citation: 01 Item/Group: 002C Hazard:
29 CFR 1910.147(d)(2): Machine or equipment shutdown. The machine or equipment shall be turned off or shut down using the procedures established for the machine or equipment. An orderly shutdown must be utilized to avoid any additional or increased hazard(s) to employees as a result of the equipment stoppage. a. At the workplace, the employer did not require the Small Flexo machine and the Tri-Plex machine to be deenergized and locked out prior to employees performing servicing and maintenance during set-up operations.