Violation Detail
Standard Cited: 19260502 B05 Fall protection systems criteria and practices.
Inspection Nr: 1174727.015
Citation: 01002C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/03/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/30/2017
Gravity: 10
Report ID: 0636900
Contest Date: 02/23/2017
Final Order: 09/18/2017
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 09/18/2017 | $0.00 | 11/30/2017 | Serious | |
| Penalty | C: Contested | 02/23/2017 | $0.00 | 02/27/2017 | Serious | |
| Penalty | Z: Issued | 02/03/2017 | $0.00 | 02/27/2017 | Serious |
Text For Citation: 01 Item/Group: 002C Hazard:
29 CFR 1926.502(b)(5): Midrails, screens, mesh, intermediate vertical members, solid panels, and equivalent structural members were not capable of withstanding, without failure, a force of at least 150 pounds (666 N) applied in any downward or outward direction In Terminal A, Gate 39, third floor: The employer did not ensure the midrail system on the elevator shaft was installed correctly to withstand a downward or outward direction exposing employees to a fall hazard.