Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 995572.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $7,000.00
Issuance Date: 02/27/2015
Nr Instances: 1
Nr Exposed: 11
Abatement Date: 07/27/2015
Gravity: 10
Report ID: 0524700
Contest Date: 03/23/2015
Final Order: 06/25/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/25/2015 | $7,000.00 | 07/27/2015 | Serious | |
| Penalty | C: Contested | 03/24/2015 | $0.00 | 03/10/2015 | Serious | |
| Penalty | Z: Issued | 02/27/2015 | $0.00 | 03/10/2015 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going integrity of process equipment. a. Toledo Refining Company LLC located in Oregon, Ohio: On or about September 2, 2014, the employer did not ensure the mechanical integrity program was being implemented to maintain the ongoing integrity of process heater H-6104 located in Plant 6. The convection section of the process heater was initially scheduled to be replaced in 2013 but was later rescheduled to be replaced in Fall of 2014 without evaluating the integrity of the equipment.
Translate