Violation Detail
Standard Cited: 19260950 C01 General.
Inspection Nr: 977538.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/01/2014
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/12/2014
Gravity: 5
Report ID: 0215800
Contest Date: 07/17/2014
Final Order: 12/19/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 12/19/2014 | $0.00 | 07/12/2014 | Serious | |
| Penalty | C: Contested | 08/18/2014 | $0.00 | 07/12/2014 | Serious | |
| Penalty | Z: Issued | 07/01/2014 | $0.00 | 07/12/2014 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.950(c)(1): Employee(s) were not permitted to approach and/or take any conductive object(s) without an approved insulating handle closer to exposed energized parts than shown in Table V-1: a) South side of building, southwest corner, on or about 5-19-14: Employees were erecting walls within 3 to 5 feet of energized 4,800 volt primary power lines.
Translate