Violation Detail
Standard Cited: 19100147 C07 III A The control of hazardous energy (lockout/tagout).
Inspection Nr: 97281.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/19/2011
Nr Instances: 2
Nr Exposed: 1
Abatement Date: 11/18/2011
Gravity: 10
Report ID: 0521100
Contest Date:
Final Order: 11/15/2011
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 10/19/2011 | $0.00 | 11/18/2011 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.147(c)(7)(iii)(A): Retraining was not provided for authorized and affected employees when there was a change in their job assignments, a change in machines, equipment or processes that presented a new hazard, or when there was a change in the energy control procedures: Employees performing lock out during regular servicing of the Harris (HSC) shear were not retrained on potential hazards when the equipment was modified: a.) I-beams were used in lieu of safety pins to block the crosshead; b.) The liners were bent and crumpled in the clamp slide, and bolts were replaced with welded components. c.) Employees were not separately instructed on which piece of equipment needed a particular block. d.) Employees were not trained in the possible hazards of liner modification or removal.
Translate