Violation Detail

Standard Cited: 19100036 G01 Design and construction requirements for exit routes.

Inspection Nr: 961334.015

Citation: 01002B

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 07/30/2014

Nr Instances: 1

Nr Exposed: 10

Abatement Date: 08/30/2014

Gravity: 10

Report ID: 0213600

Contest Date:

Final Order: 08/21/2014

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 08/21/2014 $0.00 08/30/2014 Serious  
Penalty Z: Issued 07/30/2014 $0.00 08/30/2014 Serious  

Text For Citation: 01 Item/Group: 002B Hazard:

29 CFR 1910.36(g)(1): Ceiling of an exit route was not at least seven feet six inches. Any projection from the ceiling must not reach a point less than six feet eight inches from the floor. a) On or about 03/05/14, in the Power and Boiler House Building, a marked emergency exit door total projection from the ceiling was 6.2 feet and it was calculated as the sum of an opening of 66.5 inches and a fixed bar at the bottom of the door of 8 inches. ABATEMENT DOCUMENTATION REQUIRED

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.