Violation Detail
Standard Cited: 19260451 D12 II General requirements.
Inspection Nr: 768903.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 06/04/2013
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/28/2013
Gravity: 10
Report ID: 0317900
Contest Date:
Final Order: 06/17/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/17/2013 | $0.00 | 06/28/2013 | Serious | |
| Penalty | Z: Issued | 06/04/2013 | $0.00 | 06/28/2013 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.451(d)(12)(ii): Wire rope clips used on suspension scaffold ropes were not installed according to the manufacturer's recommendations: a) Water Tower, Suspended Scaffold - On or about December 5, 2012, the 'cable eye' suspension line of a single point suspension scaffold was constructed with wire rope clips that were installed in a manner contrary to the Crosby Group's user guide for installation, security, and tightening. Abatement Note: The use of fist grip clips and U-Bolt wire rope clips must be installed and maintained in accordance with the manufacturer's information regarding positioning, tensioning, and wire rope size compatibility.