Violation Detail
Standard Cited: 19260453 B02 VI Aerial lifts.
Inspection Nr: 723141.015
Citation: 01002B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 04/30/2013
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/24/2013
Gravity: 10
Report ID: 0936200
Contest Date: 06/18/2013
Final Order: 03/03/2014
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/03/2014 | $0.00 | 05/24/2013 | Serious | |
| Penalty | C: Contested | 10/23/2013 | $7,000.00 | 05/24/2013 | Serious | |
| Penalty | Z: Issued | 04/30/2013 | $7,000.00 | 05/24/2013 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1926.453(b)(2)(vi): Boom and basket load limits specified by the manufacturer were exceeded: The employer allows employees to operate aerial lifts having an exceeded boom and basket load limit. This violation was most recently observed at MCAS Hangar 7, S-65 Genie lift no. 16986, where the employer failed to ensure the basket load limit was not exceeded.
Translate