Violation Detail

Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.

Inspection Nr: 432035.015

Citation: 01002B

Citation Type: Other

Abatement Status: Abatement Completed

Initial Penalty: $0.00

Current Penalty: $0.00

Issuance Date: 10/05/2012

Nr Instances: 2

Nr Exposed: 7

Abatement Date: 07/01/2013

Gravity:

Report ID: 0830600

Contest Date:

Final Order: 10/24/2012

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 10/24/2012 $0.00 07/01/2013 Other  
Penalty Z: Issued 10/05/2012 $0.00 01/04/2013 Serious  

Text For Citation: 01 Item/Group: 002B Hazard:

29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (defined by the process safety information on paragraph (d) of this section) before further use: a) On or about May 14, 2012 and at times prior, several of the pressure relief valves installed at the facility were deficient in that, many of these valves were undersized, or had other deficiencies such as high back-pressure, potential vessel failure, high inlet losses or did not meet criteria for fire scenarios. These deficiencies were identified by a third party study of the relief system in 2008, many of which have not been corrected to date. b) On or about May 14, 2012 and times prior, employees were exposed to a potential unintended release of high pressure NGL from improperly supported lines which resulted in excessive vibration at the following locations: 1. PSV 865 discharge line located outside of the compressor building on the southwest corner. This was a vertical discharge line where the mounts at the base had come loose. 2. Product discharge line east of the NGL product pumps. There was excessive vibration in this line due to the line not being effectively supported. 3. Overhead and vertical NGL product lines near the NGL product pumps. These lines were vibrating excessively due to the lack of adequate supports. Abatement Note: Abatement certification and documentation is required for this item (see enclosed "Certification of Corrective Action Worksheet").

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.