Violation Detail
Standard Cited: 19260404 F06 Wiring design and protection.
This violation item has been deleted.
Inspection Nr: 311217913
Citation: 01002B
Citation Type: Serious
Abatement Status: I
Initial Penalty:
Current Penalty:
Issuance Date: 06/24/2009
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 06/29/2009
Gravity: 10
Report ID: 0830100
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/15/2009 | 06/29/2009 | Serious | ||
| Penalty | Z: Issued | 06/24/2009 | 06/29/2009 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard: REFINERY
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: a) On or about March 17, 2009 and at times prior Petrochem Insulation Inc. did not ensure that employees were protected from electrical hazards. An electric extension cord used to power a hand shear did not have a ground prong.