Violation Detail
Standard Cited: 19100119 F01 I G Process safety management of highly hazardous chemicals.
Inspection Nr: 1809314.015
Citation: 01002B
Citation Type: Serious
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/18/2025
Nr Instances: 1
Nr Exposed: 180
Abatement Date: 10/03/2025
Gravity: 5
Report ID: 0316300
Contest Date: 09/10/2025
Final Order:
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 09/10/2025 | $0.00 | 10/03/2025 | Serious | |
| Penalty | Z: Issued | 08/18/2025 | $0.00 | 10/03/2025 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.119(f)(1)(i)(G): The employer did not develop and implement written operating procedures that provide clear instructions for safety conducting activities involved in each covered process consistent with the process safety information and did not address the steps for each operating phase including startup following a turnaround or after an emergency shutdown: a) Green Lines Multi Base Process, Remote Blocker Building: On or about February 28, 2025, the employer did not develop and implement operating procedures that provide clear instructions for resetting of the system after a normal stop, startup following a turnaround, or after an emergency shutdown of the preblocker. This condition exposed employees to an explosion hazard. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records
Translate